Most Architects, Engineers, Developers, and Contractors know that any kind of delay in submitting and having plans reviewed in City Permitting cost time, money and can impact the target start date for construction. Often times the simplest reasons can cause a delay and from our experience expediting permits on many types of projects, here are the top five reasons for delays cited by City Permitting Plan Reviewers.

    Top Five Reasons and Tips to Avoid Delays in City Permitting

20160907_072830

No signature on submitted plan set – Designing Architects and Engineers are busy and maybe working on multiple projects and while it is a simple mistake, many times the Professional forgets to sign the drawings. In turn, City Permitting does not accept the plan set until signed. Tip: Sign drawings

No professional stamp or seal not decipherable i.e. smeared – While the drawings may be signed, another reason for the possible delay is when the Professional’s seal or stamp on drawings is smeared, distorted and not readable. This is an avoidable mistake that can create a delay during submission or in the review process. Tip: Review plan set to confirm quality seal in place

Punt delays in permitting

Failure to Respond to Rejections – When areas on the drawings are incorrect or not understood or is a gray area in complying with building codes then the Plan Reviewer will create a rejection notice. Each rejection is to be responded to and corrected where needed and not doing so can cause immediate and sometimes substantially long delays. Tip: Respond to all rejections

Not Considering Building Permit during Design Phase – Last minute thinking about needing a building permit often causes errors on drawings and can result in key items on City Permitting checklist to be missed. This scenario can create a very stressful experience for all parties involved including City Plan Reviewers plus cause significant delays to submit and in reviewing plan set. Tip: Plan ahead.

Taking a Long Time to Respond to Rejections from City Permitting – Often times once the plans are submitted into building permitting the Architect or Engineer may have shifted to working on new projects. This can create an overburdened scenario resulting in the Architect or Engineer taking an inordinate amount of time to respond to City Permitting rejections and then resubmit plan set with corrections. Tip: Schedule to make corrections in a timely manner.

We realize it is important not only for our clients but for the industry as a whole to focus on what their organization does best, and we’re here to take away the hassles of obtaining building permits including avoiding simple mistakes that can cause unnecessary delays. Call us at 1.844.PERMIT-4 for assistance with your next building permit and other related services.

Len

Contact Us

Get Started

Need a building permit, certificate of occupancy, ADA inspection or other related services for your construction project? Call us first at 1.844.737.6484 or fill out this form to get in touch with us. We’ll be happy to serve you

Contact Information

  • 1.844.PERMIT.4
  • 866.760.0407
  • HQ: 720 Rusk Street, Suite 223

    Houston, Texas 77002

    Regional: 700 Lavaca, Suite 1400,

    Austin, TX 78701